Set it up as a project, with a start, an end and someone teaching people how it works, and it takes a fortnight. Let it arrive as a string of recurring calendar invitations that nobody explains, and you get the meetings without any of the benefit, which is where most teams asking this question already are. This is the second part of our guide for people running an in-house marketing team, and the first part covers what squads, scrums and agile actually are and whether you need any of it.

Our interest, stated first. We do fractional and part-time marketing leadership, which often means fixing how a team works, so a piece saying this is worth doing is a piece that suits us. Everything below is something a team can do for itself, and the last section is about when not to bother.

Day one: the smallest setup that works

You need four decisions and one afternoon.

  1. Pick the length of your cycle, and never move it. Two weeks suits most marketing teams, because campaign work rarely finishes in one and attention wanders in four. Whatever you choose, the point is that it ends on a known day.
  2. Put the work where everyone can see it. Use one board with every piece of work on it and no more than three columns to begin with: to do, doing and done. The tool matters far less than everyone using the same one.
  3. Agree in writing what "done" means. This is the decision that saves the most arguments later. Done means published, or approved, or live, and it means the same for everybody.
  4. Put two meetings in the calendar and no others. Hold a short one at the start of the cycle to agree what goes into it, and a short one at the end to look at what happened and name one thing to change. Add a 15-minute catch-up, daily or twice a week, only if people genuinely don't know what the others are doing, and drop it the moment they do.

Then run it for three cycles before you change anything, because the first one always feels worse than what you had before.

Teach it, or it will fail

What decides whether this works isn't the method. It's whether anybody explained it.

I've worked in places where there was no explanation of how agile, scrums or standups were done at all. You were thrown in and left to drown: no onboarding guide, no principles, no explanation of how they used Jira or what they were doing with Git. The onboarding was awful, and the people suffering most were the ones who most wanted to do it properly.

The good version looks the opposite. At PlayStation we set up agile squads with an agile coach, running across regions and teams, from experiment marketing through to CRM and engineering, with people in the US, Japan, Europe and the UK. We stood it up very quickly and learned as we went, but we had a defined period to set it up and we did it properly. It worked really well. The coach was the difference: somebody whose job was to teach the thing rather than attend it.

If you have nobody who can teach it, buy a few days from somebody who can, with a brief that says they leave at the end. An open-ended coaching retainer is how a two-week change becomes a permanent cost.

What a well-run cycle actually looks like

At NatWest, working on digital product, we had the sprint cycle nailed. It was run rigidly and properly, and that was the impressive part: the cycle was genuinely fixed, so what went into it was a real decision and what came out of it was real work. Rigid is the right word, and most teams that think they're doing this are not.

At King, everyone in every team knew their role: UX, marketing, engineering and the supporting teams. There was a project planner, and the plan was something people actually worked to. Where timelines were pressured, things did slip and agreements were missed, but that happens anywhere, and it's worth saying plainly, because an account where nothing ever slips is an advertisement rather than a description.

The four mistakes that break it

Adding meetings without removing any. Sprint planning goes in, the standup goes in, the retrospective goes in, and the old weekly status meeting, the monthly review and the project update email all stay. Now the team has less time to work than it had before. Take something out for everything you put in.

Treating the board as a report for management. Once the board exists to be looked at from above rather than used by the people on it, they start managing how their work looks. You'll know it has happened when nothing is ever "blocked".

Never acting on the retrospective. A review that changes nothing is a complaints meeting, and people soon stop bringing anything real to it. One change per cycle, written down with a name beside it, is enough.

Copying a structure instead of a habit. Squads and tribes were one company's arrangement at one moment, and even the people who wrote it up called their account a snapshot, as the first part of this guide explains. Borrow the habits, which are small, and leave the organisation chart alone until the habits work.

If you already have it and it isn't working

Run these five checks, in this order, before you change anything:

  1. Does the cycle actually end? If work routinely rolls over, you don't have cycles, you have a queue with meetings attached. Halve what goes into the next one and see what happens.
  2. Can anyone say what "done" means? Ask three people separately. If you get three answers, start there.
  3. Who decides what goes in? If the answer is "whoever asks loudest", the problem is priorities, not process. It's usually the budget conversation in disguise, and how to split a small marketing budget has that argument with the numbers in it.
  4. Is anything ever dropped? A system that only ever adds work isn't a system.
  5. Did anyone explain it to the newest person? If not, fix that this week. It costs an hour, and it's the cheapest thing on this list.

If all five are fine and it still isn't working, the problem probably isn't the process. Unclear strategy, missing skills and a brief that keeps changing will survive any method you put on top of them. Working out whether the work is paying off is a different diagnosis, and it uses the test you'd apply to judge whether an agency is doing a good job: the customers the work wins you, and what each one costs.

When not to bother

A team of two or three that sits together and talks all day doesn't need a framework. Nor does a team whose work is genuinely continuous, such as one person running paid search day to day. The test isn't the size of the team but whether you keep being surprised: by what people are working on, by what's late, or by what turned out not to matter. If nothing surprises you, you already have whatever this was going to give you.

If you'd like somebody to run the setup and then leave, ask for a free call. That's what fractional and part-time marketing leadership looks like in practice, and where the first job is working out what the team should be doing at all, our 90-day marketing plan starts there.

Rob Oxborough
Written by Rob Oxborough

I founded oXo Creatives, an independent marketing agency and consultancy, in 2013 and run it full-time. Until 2026 I ran it alongside senior in-house marketing roles at Google, PlayStation and King, partner management at Meta, and digital product at NatWest.

Want help with digital marketing strategy?

One plan across every channel, so your budget goes where it works. A few weeks, depending on scope.

What's included

Good for